3ALL COSTS ARE
IN RMB
QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量
单 位
单 价
合 价
小 计
总 计
Total without
Management Fees & Tax
11,861,472.08
I Ph as 11,666,236.03
1.1Pil e
1,688,647.00
1.1.2Piling 8,823.00
m
179.00 1,579,317.00
桩
1.1.3Load testing 1.00
lot
30,000.00 30,000.00
静载检测1.1.4Sonic testing 1.00
lot
15,000.00 15,000.00
小应变检测1.1.5Connection rebar 7.00
T
7,500.00 52,500.00
接桩钢筋1.1.6
五一节日快乐祝福图片Grouting concrete 22.75
m3
520.00 11,830.00
灌芯砼C351.2Fo un
5,764,685.33
1.2.1Steel Sheet Pile 1.00
lot
180,000.00 180,000.00
钢板桩围护
1.2.2WellPoint dewatering 1.00
lot
30,000.00 30,000.00
井点降水1.2.3Excavation 9,600.00
m3
13.00 124,800.00
挖土1.2.4Backfill 2,300.00
m3
10.00 23,000.00
唐嫣工作室声明回填土
1.2.5Transport soil out of site 7,300.00 m3 78.00 569,400.00土方外运1.2.6 150mm C15 Concrete
Cushion
198.00 m3 490.00 97,020.00150厚C15混凝土垫层1.2.720mm leveling layer of WP20 cement mortar 1,439.00 m2 8.00 11,512.0020厚WS20水泥砂浆平层1.2.8First layer of 3.0mm self-stick polymer modified 1,378.00 m2 95.00 130,910.00一道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层1.2.9Two layers of 3.0 self-stick polymer modified asphalt 92.00 m2 190.00 17,480.00二道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层1.2.1015mm WS20 Cement Mortar isolated layer 1,439.00 m2 8.00 11,512.0015厚WS20水泥砂浆隔离层1.2.1150mm C20 fine aggregate concrete
74.00 m3 498.00 36,852.0050厚C20细石混凝土1.2.12
15mm WS20 cement mortar isolated layer
1,800.00
m2
8.00 14,400.00
15厚WS20水泥砂浆隔离层
CIVIL WORK 土建工程
DESCRIPTION 描 述
3ALL COSTS ARE
IN RMB
QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价
合 价
小 计
总 计
CIVIL WORK 土建工程
DESCRIPTION 描 述
1.2.13First layer of 3.0mm self-stick polymer modified 1,660.00 m2 95.00 157,700.00一道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层1.2.14Second layer of 3.0mm self-stick polymer modified 140.00 m2 190.00 26,600.00二道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层1.2.1520mm leveling layer of WP20 cement mortar 1,800.00 m2 8.00 14,400.0020厚WP20水泥砂浆平层1.2.1650mm fine sand
90.00 m3 230.00 20,700.0050厚细砂保护层1.2.17120mm M10 solid concrete brick wall 226.00 m3 728.00 164,528.00120厚M10混凝土实心砖保护墙
1.2.18Pile caps bedding course 39.00 m3 490.00 19,110.00承台垫层砼1.2.19Formwork for bedding course 92.00 m2 81.50 7,498.00承台垫层模板1.2.20Steel bar for pile cap 29.60 t 5,120.00 151,552.00承台钢筋
1.2.21Formwork for pile cap 276.00 m2 81.50 22,494.00承台模板
1.2.22C30 concrete for pile cap 145.00 m3 510.00 73,950.00承台C30砼1.2.23Foundation beams bedding course 6.10 m3 490.00 2,989.00地梁垫层砼
1.2.24Formwork for beam bedding 23.40 m2 81.50 1,907.10地梁垫层模板
1.2.25Foundation beams steel bar 5.80 t 5,120.00 29,696.00地梁钢筋1.2.26Foundation beams formwork
136.00 m2 81.50 11,084.00地梁模板1.2.27C30 Concrete of Foundation Beams
21.30 m3 510.00 10,863.00地梁C30砼1.2.28C30 P6 Concrete of Equipments Passage 741.68 m3 512.00 379,740.16设备通道混凝土C30P61.2.29Formwork of Equipments Passage
3,885.42 m2 81.50 316,661.73设备通道模板1.2.30Steel Reinforcement of Equipments Passage 110.84 T 5,120.00 567,500.80设备通道钢筋1.2.31Concrete Cushions of Pump house, Equipment 216.20 m3 490.00 105,938.00泵房,设备通道及设备基础垫层混凝土1.2.32Formwork of concrete cushion(Pump house, 85.37 m2 81.50 6,957.
66泵房,设备通道及设备基础垫层模板1.2.33
Concrete work of Equipment foundations(C30,P6) 936.83
m3
512.00 479,656.96
设备基础混凝土C30P6
3ALL COSTS ARE
IN RMB
QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价
合 价
小 计
高考成绩今日公布总 计
CIVIL WORK 土建工程
DESCRIPTION 描 述
1.2.34Formwork of Equipment Foundations
402.23 m2 81.50 32,781.75设备基础模板1.2.35Steel Rebar of Equipment Foundations
98.94 T 5,120.00 506,572.80设备基础钢筋1.2.36Concrete of Pump House (C30,P6)
517.90 m3 512.00 265,164.80泵房混凝土C30P61.2.37Formwork of Pump House 1,450.20 m2 81.50 118,190.97泵房模板
1.2.38Steel Rebar of Pump House 161.30 T 5,120.00 825,856.00泵房钢筋1.2.39Concrete of Steel Pillars(C30,P6) 92.46 m3 512.00 47,339.52型钢柱混凝土C30O61.2.40Formwork of Steel Pillar Concrete
431.50 m2 81.50 35,167.09型钢柱模板1.2.41
Steel Rebar of Steel Pillar Concrete 22.50
T
5,120.00 115,200.00
型钢柱钢筋1.3Gr
ou
1,003,577.00
1.3.1Soil Compaction
2,769.00 m2 8.00 22,152.00素土压实1.3.2150mm detritus bedding course
415.30 m3 260.00 107,978.00150mm 碎石垫层1.3.350mm medium sand bedding course 139.70
m3
230.00 32,131.00
50mm 厚中砂垫层1.3.4300mm C30 Concrete 810.00 m3 510.00 413,100.00
300厚C30砼随捣随光
1.3.5Mono steel reinforcement net ∮14@200
38.00
t
5,120.00 194,560.00
单层钢筋网双向∮14@2001.3.6150mm C20 concrete 97.00 m3 498.00 48,306.00150厚C20砼随捣随光1.3.7Mono steel reinforcement net ∮8@200
3.20
t
5,120.00 16,384.00
单层钢筋网双向∮8@2001.3.8Formwork of Floor 156.00
m2
81.50 12,714.00
地坪模板1.3.9Floor block joint 600.00
m
8.00 4,800.00
分仓缝
1.3.10
Hardener Floor surface 4,207.00
m2
36.00 151,452.00
BASF Harden
Floor
耐磨地面1.4M
ai
601,200.00
1.4.1
Steel Rebar of floor plate 72.00
t
5,120.00 368,640.00
楼承板钢筋
3ALL COSTS ARE
IN RMB
QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价
合 价
小 计
总 计
CIVIL WORK 土建工程
DESCRIPTION 描 述
1.4.2C30 concrete of floor plate 456.00
m3
510.00 232,560.00
C30楼承板混凝土1.5W
all 1,402,634.90
1.5.1200mm autoclaved aerated
concrete under ±0.0 42.80 m3 720.00 30,816.00±0.0以下200厚蒸压加气混凝土砌块1.5.260mm C20 fine aggregated
concrete (φ4 bidirectional 298.00 m 80.00 23,840.0060厚C20细石混凝土(φ4双向@200防潮层1.5.3240mm outer concrete bricks
58.40 m3 786.00 45,902.40240厚外墙混凝土砌块1.5.4200mm aerated concreted bricks
736.00 m3 765.00 563,040.00200厚加气混凝土砌块1.5.5100mm aerated concrete bricks
4.10 m3 76
5.00 3,13
6.50100厚加气混凝土砌块1.5.6300mm high concrete waterproof wall
13.80 m3 510.00 7,038.00300高混凝土防水挡墙1.5.7Concrete surface adhesion agent 2,228.00 m2 8.00 17,824.00混凝土界面剂
1.5.810mm WP15 cement mortar 12,757.00 m2 1
2.00 153,084.0010厚WP15水泥砂浆打底压实抹平1.5.92mm polyurethane
waterproof coat(non tar, two 242.00 m2 65.00 15,730.002厚聚氨酯防水涂料一层(非焦油型,分两道刷)1.5.1012mm WP5 composite mortar
女儿表达父爱的说说12,757.00 m2 12.00 153,084.0012厚WP5混合砂浆刮糙1.5.118mm WP10 composite mortar
12,757.00 m2 20.00 255,140.008厚WP10混合砂浆粉面1.5.1260mm GRC-M plates 1.00 lot 65,000.00 65,000.0060厚GRC-M 板封砌1.5.13
Fire proof treatment of Pillars 1.00
lot
69,000.00 69,000.00
钢柱防火处理1.6D oo
389,122.80
1.6.1Aluminum alloy door 1024 5.00 sets -铝合金门1024
1.6.2Aluminum alloy door 1524 5.00 sets -铝合金门1524
1.6.3Aluminum alloy door 1524 1.00 sets -铝合金门1524
1.6.4Solid Plywood door 1021 9.00 sets -实木夹板门1021
1.6.5
ipad没有声音Solid Plywood door 1521 6.00
sets
-
实木夹板门1521
3ALL COSTS ARE
IN RMB
QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价
合 价
小 计
总 计
CIVIL WORK 土建工程
DESCRIPTION 描 述
1.6.6Steel Roller Shutter Door 3030
6.00 sets 11,664.00 69,984.00钢质卷帘门30301.6.7Grade A fireproof Roller Shutter door 3030
7.00 sets 16,735.20 117,146.40甲级防火卷帘门30301.6.8Grade A fireproof door 1521
8.00 sets 6,988.80 55,910.40甲级防火门1521
1.6.9Grade A fireproof door 1821 1.00 sets 7,826.40 7,826.40甲级防火门1821
1.6.10Grade A fireproof door 1021
2.00 sets 3,912.00 7,824.00甲级防火门1021
1.6.11Grade A fireproof door 1221 1.00 sets 4,75
2.00 4,752.00甲级防火门1221
1.6.12Grade A fireproof door 2424 1.00 sets 8,389.20 8,389.20甲级防火门2424
1.6.13Grade B fireproof door 1021 7.00 sets 3,760.80 26,325.60乙级防火门1021
1.6.14Grade B fireproof door 1521 6.00 sets 6,127.20 36,763.20乙级防火门1521
1.6.15Grade C fireproof door 0823 1.00 sets 3,168.00 3,168.00丙级防火门0823
1.6.16Grade C fireproof door 1223 10.00 sets 4,293.60 42,936.00丙级防火门1223
1.6.17Grade C fireproof door 1121
2.00 sets 4,048.80 8,097.60
丙级防火门11211.6.18Aluminum alloy rainproof louver 0812
1.00 sets -铝合金防雨百叶窗08121.6.19Aluminum alloy rainproof louver 1608
1.00 sets -铝合金防雨百叶窗16081.6.20Aluminum Alloy rainproof louver 1524
4.00 sets -铝合金防雨百叶窗15241.6.21Aluminum alloy glass window 1524 7.00 sets -铝合金玻璃窗15241.6.22Aluminum alloy glass window 3024 14.00 sets -铝合金玻璃窗30241.6.23
Aluminum alloy glass window 5024 3.00
sets
-
员工宿舍管理制度铝合金玻璃窗50241.7R
oo 770,019.00
1.7.140mm foam glass, 140mm
thermal insulation board 2,989.00 m2 55.00 164,395.00 40厚泡沫玻璃140保温板(燃烧性能A 级)
1.7.2
minimum 30mm LC5.0 light
aggregate concrete (2% 2,989.00
m2
35.00 104,615.00
最薄处30厚LC5.0轻集料混凝土2%坡层